Control Systems Engineer with twenty-five (25+) years in engineering, programming, design, construction, commissioning and start-up in the Oil/Gas production, refining, power and petrochemical, Pharmaceutical, Manufacturing industries. Experience includes:
· Project and construction management, Process Instrumentation, DCS, PLC, ESD and SCADA; Compressor control and anti-surge systems, GE Multilin motor protection, Variable Frequency Drive - design, startup and commissioning.
· DCS Configuration and Programming of process computers, PLC, SCADA, ESD, LAN Administration, Windows NT, 2000, 2003 Server, programming SQL server applications, programming Visual Basic, C & C++ with ActiveX and a MSDN Universal subscriber.
EDUCATION California State University San Jose, California
B. S. – Electrical Engineering 1973
E. I. T. State of California
Post Graduate Studies - Electrical Engineering
United States Army Fort Bliss, TX
Electronic Technical School
EXPERIENCE
Baxter Bioscience Manufacturing – Thousand Oaks, CA Feb 2007 – Mar 2008
Commissioning and Validation of a DeltaV Manufacturing Control System for a cell culture facility.
Tasks and responsibilities: Developed and executed OQ protocols. Performed protocol deviation resolution. Created OQ protocol final summary reports.
Processes Unlimited, Inc. – Bakersfield, CA. July 2006 – Feb 2007
Project Engineer
Control System / Instrumentation Design on projects for Chevron, Exxon-Mobile, Occidental Petroleum and chemical plants. Consolidated an Occidental Petroleum control room into Delta V from 16 gas turbines and misc. plant PLC’s using serial Mynah cards. Configured all graphics, PID control loops and discretes to control Allen Bradley PLC’s.
Lloyd’s Register Serentec, Inc. – Raleigh, NC. Sept 2005 – May 2006
Technical Consultant
Genentec – Oceanside, CA
Validation of a DeltaV Manufacturing Control System for a cell culture facility. Process areas involved are: Fermentation, Harvest and Purification. Tasks and responsibilities:
· Performed software risk assessments
· Developed and executed OQ protocols
· Performed protocol deviation resolution
· Created OQ protocol final summary reports
Emerson – Austin, TX Technical Consultant 2005
Baxter – Los Angeles, CA
Validation of a DeltaV Manufacturing Control System for a cell culture facility. Tasks and responsibilities:
· Developed and executed OQ protocols
· Performed protocol deviation resolution
· Created OQ protocol final summary reports
Lloyd’s Register Serentec, Inc. – Raleigh, NC Technical Consultant 2004-2005
Biogen Idec – Oceanside, CA
Validation of a DeltaV Manufacturing Control System for a cell culture facility. Process areas involved are: Fermentation, Harvest and Purification. Tasks and responsibilities:
· Performed software risk assessments
· Developed and executed OQ protocols
· Performed protocol deviation resolution
· Created OQ protocol final summary reports
Cornerstone Controls – Indianapolis, IN and Puerto Rico 2003 - 2004
Eli Lilly – Puerto Rico
· Pharmaceutical - DeltaV Basic, Batch - Programming and Testing. Responsible for programming Folding, Crystalization and Utility units. All base builds, phases and recipes were tested using I/O with Mimic interface. Tested control modules to conform to Lilly standards.
· Familiar with 21 CFR Part 11 and current good manufacturing practices (cGMP) as recommended by FDA.
· Trained in basic and batch programming with Emerson certification.
Alza Corporation – Palo Alto, CA 2001
Pharmaceutical
· Aseptic clean room environment, Control Down Force modification for diffusion moderator inserter – Add load cells under centrifuge bucket to give accurate measurement of force and modify Galil four position motor drive program to control down force at 450 Grams.
· Wrote Direct Logic PLC program with an Optimate operator interface to calibrate, display and alarm. Solved problems with SLC-500 networked water Stills and RO units.
Black & Veatch / Pritchard – Shedgum, Saudi Arabia 2000 - 2001
Foxboro I/A and Triconex ESD System, GE Multilin / Rockwell GV 3000 AC Drives Electrical Instrumentation/Commissioning.
· Supervise the installation, Engineer design changes and Commission field instrumentation / electrical control devices, Foxboro DCS / Triconex ESD for new Sulfur recovery plant and HPDGA / TEG facility process interface.
· Implement process interface, console modifications and networking expansion of plant central control room facility.
M/D TOTCO/ VARCO Systems – VICIS – Brest, France 2000
Commissioning / Startup of Drilling Systems, SEDCO FOREX (Contract)
· Porch hoist / drilling floor Siemens S-7 PLC. Program and startup tools controlled by Wonderware on an NT network with touch screens from the Drillers cabin; accompanied ship on Atlantic sea trials.
Black & Veatch / Pritchard – Coffeyville, Kansas 1999 – 2000
Honeywell TPS and PLC System Configuration/Commissioning (Contract)
· New Coke Gasification facility with nine supporting plants, such as RO, Clarification, Synthesis Gas compression, PSA, boilers startup heaters and more.
· PLC’s integrated into DCS include Allen Bradley for coke handling, RO plant and heaters/boilers, Modicon for PSA unit and GE Fanuc for Dresser Compressors.
M/D TOTCO/ VARCO Systems – VICIS – Austin, Texas 1998 - 1999
Control Systems Integration / Commissioning (Contract)
· VICIS Network - Drilling Ship Automation - Responsible for integration of drilling tool controllers; Siemens S5, S5-135, S7-300 and 400, GE Fanuc, Allen Bradley PLC's via Profibus and Ethernet into an NT network for Diamond Offshore's 'Ocean Confidence'.
· The drilling operation is completely controlled by a Drilling chair with four MMI touch-screens, joysticks and hardwired switches.
· Auxiliary services such as pipe racking, mud, and constant motion control are controlled by the assistant driller's chair with three MMI's. MMI graphics and controls are provided with Wonderware Factory Suite 7.0 using PCDDE. Siemens PLC languages utilized are SCL (Pascal) and STL.
Saudi Arabian American Oil Company – Saudi Arabia 1977 - 1998
Lead Engineer - Control Systems/Instrumentation, Northern Area Producing/Control Systems & Automation Unit, Tanajib, Saudi Arabia. (1991 – 1998)
· Direct and supervise twelve (12) Engineers in software development and upgrades for the office and plant systems.
· Perform LAN administration and computer security; formulate forecasts of computing needs and prepare budgets for plant upgrades and replacements.
Projects include:
· Upgrade ARB-1 work-over barge’s Allen Bradley leg jack-up to Rockwell Software RSLogic and RSView running Windows NT.
· Rewrite the well test software to Windows NT using C++ foundation class Libraries OBDC to Oracle 7.0 database for uploading to Sun Oracle Network for Petroleum Engineering.
· Manage Honeywell TDC-3000 control systems with smart transmitters, mostly Triconex ESD systems and a variety of programmable logic controllers.
· Completed SCADA systems with Bristol Babcock RTU’s at wellhead communicating via radio or submarine cable to offshore gas oil separation plant control room Honeywell TDC3000 Communication Link Modules mirrored to Application Modules.
Lead Engineer Control Systems/Instrumentation, Northern Area Producing/NAP Specialist Unit, Ras Tanura, Saudi Arabia. (1988 – 1991)
· Directed six (6) engineers in control system engineering and commissioning support for one (1) offshore plant and six (6) onshore plants.
· Control systems were Honeywell Vuetronic, mostly Gould Modicon and Powell solid state ESD systems and a variety of programmable logic controllers.
· SCADA systems were SCI RTU’s communicating via submarine cable from wellheads and tie-in platforms to a Perkin Elmer mini-computer onshore.
Control Systems/Instrumentation Specialist, Northern Area Producing/NAP Specialist Unit, Ras Tanura, Saudi Arabia. (1986 – 1988)
· Managed the design and installation of instrumentation, metering and well test interfacing for well test barges. Wrote well test software, hardware and graphical interface in ‘C’ language for well test barge Arabiyah III, IV and V. Wrote an interface for a Well test separator on tie-in platform number three, Berri field, reading the data from the onshore Perkin-Elmer computer local RTU’s into a PC and performed well testing onshore.
· The Arabiyah IV & V interfaced through a Burr-Brown PCI-3000 data acquisition system. The Arabiyah III utilized Powell Micons for separator control; wrote an interface to the Micons for PC data acquisition for well test. All well PVT data was converted into polynomials for quick calculations rather than searching tables.
Lead Commissioning Engineer, NAPOE/NAP Specialists, Tanajib, Saudi Arabia, Offshore Gas Oil Separation Plant, Zuluf IV (1985 –1986)
· Managed the installation of Foxboro Video Spec IV, Fox 300 computer and all instrumentation, including Rolles Royce Gas generators and Prismic and Symac load sharing/shedding to GOSP 3.
Operations Advisor / Control Specialist, Northern Area Producing Operations (1984 – 1985)
· Managed all new distributed controls and SCADA systems. Coordinated the design and installation of digital control systems (Foxboro Video Spec IV, Fox 300, and Fox 1A computers, Honeywell TDC-2000 with 4500 computer) in seven (7) new offshore and two (2) onshore plants.
Commissioning Engineer, NAPOE/NAP Specialists Unit, Abu Ali, Saudi Arabia (1982 – 1984)
· Commissioned all instrumentation, Honeywell Vuetrinic, Powell solid state emergency shutdown systems for a GOSP, water injection plant, gas compressor using Speedtronic Mark II for control and Powell-Micon for antisurge. Commissioned Baker CAC hydraulic well shutdown systems in offshore Berri field.
· Commissioned a SCADA system consisting of redundant Perkin Elmer computers, 4 FDM’s, 21 SCI RTU’s which tie into the well test barge for testing the Berri field.
Instrumentation Specialist, NAPOE/NAP Specialists Unit, Ras Tanura, SA (1981 – 1982)
· Managed instrumentation for one (1) offshore plant and four (4) onshore plants which included metering, relief systems, and control system problems in these producing plants.
Instrumentation Specialist, Northern Area Operations Engineering, Specialists Unit, Ras Tanura, Saudi Arabia area including all northern area plants. (1979 – 1981)
· Resolved specific operating plant problems; units were broken up when Producing, Terminal, and Refining and Distribution Engineering units were formed in 1981.
Instrumentation Specialist, ARAMCO Services Company, Houston Texas (1977 – 1979)
· Reviewed project drawings and specifications; attended project meetings representing ARAMCO proponents in Saudi Arabia. Spent two tours in Arabia conducting plant safety surveys, as-building Abqaiq plant drawing and vacation relief. Project Engineer on Gazlan Power plant Project.
Bechtel Power Corporation – San Francisco, California 1976 - 1977
Instrumentation Design Engineer
· Designed control systems in final stages of two (2) coal fired power plants at Rock Springs, Wyoming. Laid out the alarm points, control valve order, and assisted with logic diagrams.
Pacific Gas and Electric – San Francisco, California 1973 - 1976
Field Electrical / Instrument Engineer
· Provided the construction conversion of boilers to burn crude oil. Installed scanners, burner front management computers and tank farm SCADA systems.
· Burner management control in Moss Landing plant was DEC PDP-11 computers, and Pittsburgh plant was Bailey 860 solid state systems. These conversions included all plant wiring, from pumps to damper controls to purge systems.
ASSOCIATIONS Institute of Electronic and Electrical Engineers
Instrumentation Society of America
MILITARY United States Army
Hawk Missile, Launcher & Radar Technician